Dole Wind
$9.9 Million Construction Loan – 2021
$3.12 Million Permanent Loan – 2022
5.6 MW Two-Turbine Wind Facility
Soledad, CA
2021 / 2022
© 2019 The Seminole Companies. All rights reserved
Site designed and developed by Zelen Communications